PROJECT OWNER: SAN MIGUEL GLOBAL POWER CORPORATION
CUSTOMER: FORMOSA HEAVY INDUSTRIES
Location: Barangay Culaman, Malita, Davao
Project Duration: 2014 to 2016
Scope
- Customs Clearance
- Inland Transportation of Containerized Cargoes and General Break Bulk Cargoes
- Barge Transportation
- Barge Ship Side Receiving
- Heavy Cargo Roll Off from Barge and Inland Transportation from the Jetty to Site Receiving
- Construction of temporary jetty to receive the heavy critical cargoes
- Project Management
Volume
- 125000 FRT
- 1300 Containers
Heavy Cargo
- 2 X 240 Tons Generator
- 2 X 150 Tons Transformer
- 2 X 110 Tons Steam Drum
- 2 X 50 Tons Deaerator
- 4 X 45 Tons Condenser
- 2 X 70 Tons Transformer